Building with Metricon...Good or Bad?

I have decided to go with Metricon land and package.
Do they deliver what they promise?
Are there customer service good?
Do they complete the houses on time
Any thought?
Also any thoughts about glenvill?
Reply With Quote
  #2  
Old 16-12-2008, 07:41 PM
spiduda spiduda is offline
Member
 
Join Date: Aug 2008
Location: richmond ,victoria
Posts: 13
spiduda is on a distinguished road
I am a chippy I have seen a few metricon homes and had friends build with them. I think their homes are great as for customer service I am told it is totally dependant on the project manager you get. Good luck with it all.
Reply With Quote
  #3  
Old 16-12-2008, 09:21 PM
Purple Patch Purple Patch is offline
Member
 
Join Date: Apr 2006
Location: melb
Posts: 62
Purple Patch is on a distinguished road
Personally we are nearly complete with our Metricon home, which we are very happy with. We have a good Site Supervisior. Check out this other forum for more info.
http://forum.homeone.com.au/index.php

PP
Reply With Quote
  #4  
Old 16-12-2008, 09:53 PM
naijacoder naijacoder is offline
Member
 
Join Date: Mar 2008
Location: Melbourne,VIC
Posts: 50
naijacoder is on a distinguished road
Thanks very much for the reply.
Where are you building?
Is it at Caroline Springs?

Quote:
Originally Posted by Purple Patch View Post
Personally we are nearly complete with our Metricon home, which we are very happy with. We have a good Site Supervisior. Check out this other forum for more info.
http://forum.homeone.com.au/index.php

PP
Reply With Quote
  #5  
Old 16-12-2008, 10:10 PM
asdf asdf is offline
Member
 
Join Date: Feb 2005
Location: Sydney, NSW
Posts: 1,129
asdf will become famous soon enough
Quote:
Originally Posted by naijacoder View Post
I have decided to go with Metricon land and package.
Whats the build setting you back? Single or double? Heard the display finish is up to $150k above the standard contract price. Render can add another $50-$80k to the finish. Hasn't anyone told the building industry that theres a recession in Australia?
Reply With Quote
  #6  
Old 16-12-2008, 10:20 PM
naijacoder naijacoder is offline
Member
 
Join Date: Mar 2008
Location: Melbourne,VIC
Posts: 50
naijacoder is on a distinguished road
Single Storey
What do you mean render can add another $50-$80k to the finish.
Also metricon reckons if the they are rocks on the land we would have to pay more.I heard there are rocks in caroline spring


Quote:
Originally Posted by asdf View Post
Whats the build setting you back? Single or double? Heard the display finish is up to $150k above the standard contract price. Render can add another $50-$80k to the finish. Hasn't anyone told the building industry that theres a recession in Australia?
Reply With Quote
  #7  
Old 16-12-2008, 11:25 PM
chb chb is offline
Member
 
Join Date: Sep 2008
Location: Melbourne,VIC
Posts: 93
chb is on a distinguished road
I was looking at them as well today and it seems their houses are 20-50K more expensive then others to build. I wonder if its to compensate for the 25 years warranty?

Their houses do look nice though
Reply With Quote
  #8  
Old 17-12-2008, 08:06 AM
ems ems is offline
Member
 
Join Date: Jan 2007
Location: Perth
Posts: 365
ems is on a distinguished road
Metricon builds do look good but the hubby thinks it's the furniture everyone falls in love with and not the design...The design we saw had the main bedroom right near the front door.....I don't think I could put up with that (If I was living there that is)

Ems
Reply With Quote
  #9  
Old 17-12-2008, 09:43 AM
Kenster Kenster is offline
Member
 
Join Date: Jun 2005
Location: Melbourne, Victoria
Posts: 676
Kenster has a spectacular aura aboutKenster has a spectacular aura aboutKenster has a spectacular aura about
Metricon built us a house in 2007.

Quote:
Originally Posted by naijacoder View Post
Do they deliver what they promise?
Yes, in flying colours.

Quote:
Originally Posted by naijacoder View Post
Are there customer service good?
Yes. Professional staff with matching attitude.

Quote:
Originally Posted by naijacoder View Post
Do they complete the houses on time
Yes.

Please note, it always takes two to tango. Metricon has a rigid contract & specification process at the start but it proves to be a beaut in the end, where all parties to the contract know exactly where they stand and deliver.

I regard their service highly and will build with Metricon again.
Reply With Quote
  #10  
Old 17-12-2008, 09:52 AM
Kenster Kenster is offline
Member
 
Join Date: Jun 2005
Location: Melbourne, Victoria
Posts: 676
Kenster has a spectacular aura aboutKenster has a spectacular aura aboutKenster has a spectacular aura about
Quote:
Originally Posted by asdf View Post
Heard the display finish is up to $150k above the standard contract price
We will get what we ask for and there is a price for everything.

Metricon has a reasonable range of "standard" choices for buyers to choose from. It is possible to have a good quality finish by sticking to the standard options, thereby, minimising costs.

Look out for the freebies & specials they offer sometimes.

Quote:
Originally Posted by asdf View Post
Render can add another $50-$80k to the finish.
Please contact Metricon for a quote. Hearsay can be right or wrong, which won't help us.
Reply With Quote
  #11  
Old 17-12-2008, 11:38 AM
super_sam super_sam is offline
Member
 
Join Date: Aug 2007
Location: Melbourne
Posts: 150
super_sam is on a distinguished road
Our experience is a bit different to others here

Paid Metricon $1000 in March 06 to commence work. House will be finished before xmas that year

Another $2000 the next month, still looking at xmas

Balance of 5% deposit in May (around another $11k), funds cleared now we are looking at April 07 all of a sudden. Person I've been dealing with says it's not his problem as I'm now dealing with someone else. That someone else says there's nothing that can be done xmas should never have been promised

We give notice at our rental as per confirmation that house would be finished but of course it was a major stress to have it done in time. We accept we are moving in with a heap of stuff not done, and no occupancy permit

Last day of March 07 and we take handover. Now the problems start

Solar hot water breaks first day. To their credit was fixed same day

First night we decide to have a spa together been looking forward to this for over a year. Spa jet from behind me flies out. Hits the wife in the head (at least I saw the funny side - she wasnt hurt) water is now flying out of the bit in the spa the jet came out of and floods ensuite

Dog destroys termite protection after spa incident. We have a young boxer he destroys everything. If we had of been told termite protection didnt mean having the house sprayed and instead was the plastic thing that sits above ground and goes around the house I would have had someone spray the house outside of Metricon. Accept it's my fault for not asking the right questions. Wife is pretty upset at this stage and worried for dogs health and makes me call that poison info line in the middle of the night. By this stage romance is out the window

A month or so later the french doors leading out of our bedroom into a courtyard stop closing. Accept that that's part of the house moving or whatever. Then they fall off. Dont accept that that's part of the house moving

Master bedroom door handle/latch breaks and wont open. We are in the bedroom at the time so I break through the door like in the movies. Metricon refused to fix this

Front door refuses to close (this has happened a few times since). End up putting dining chairs

None of the bedrooms hooked up to the heating unit

Solar hot water breaks continously throughout winter. They dont like frost. Happened at least 3 times that winter, and has just happened again for a different reason though

Aircon breaks. On inspection birds have also caused damage to the inside (but were'nt the cause of it breaking). Great it's under warranty but guess what? Your 12 month old $8800 aircon didnt come with bird protection so it has to be retrofitted at your expense

Oven recently broke

Ensuite shower has been re-tiled twice

Sorry for the long post that's all I can think of at this stage. Metricon (and any sane person who hasnt put up with this crap) argue that it's all third party products that are the problem. And of course everything bar bedroom door and the bird related aircon problem has been fixed to Metricon's credit. I cant compare their after sales customer service as this is the first (and most likely last) house we've built but eventually things do get fixed. But after spending close to $300k on construction (at 2006 prices) you kind of expect better

As for the house itself, it's our palace. When we have the "what would we do if we won $30m from lotto" talks, selling it isnt really on the cards
Reply With Quote
  #12  
Old 17-12-2008, 11:43 AM
super_sam super_sam is offline
Member
 
Join Date: Aug 2007
Location: Melbourne
Posts: 150
super_sam is on a distinguished road
Forgot to add garage door has stopped working twice
Reply With Quote
  #13  
Old 17-12-2008, 12:35 PM
crc_error crc_error is offline
The Rule of 72
 
Join Date: Oct 2007
Location: Melbourne, Victoria
Posts: 946
crc_error will become famous soon enoughcrc_error will become famous soon enough
thats the problem, these builders use cheap crap, and off course it breaks.. they say its 3rd party problems, but they choose those products, and continue to use them. if they have quality issues, they should not use them.. does your work place continue to use doggie suppliers?
Reply With Quote
  #14  
Old 17-12-2008, 12:58 PM
naijacoder naijacoder is offline
Member
 
Join Date: Mar 2008
Location: Melbourne,VIC
Posts: 50
naijacoder is on a distinguished road
Thanks guys...much appreciated.
What about Glenvill.
Talking to them also..
Any experiences?
There products looks for better...


Quote:
Originally Posted by crc_error View Post
thats the problem, these builders use cheap crap, and off course it breaks.. they say its 3rd party problems, but they choose those products, and continue to use them. if they have quality issues, they should not use them.. does your work place continue to use doggie suppliers?
Reply With Quote
  #15  
Old 17-12-2008, 01:04 PM
Bon Bon is offline
Member
 
Join Date: May 2008
Location: Sydney, NSW.
Posts: 659
Bon has a spectacular aura aboutBon has a spectacular aura about
How about Serentiy Projects?
Reply With Quote
  #16  
Old 17-12-2008, 02:14 PM
tobe tobe is offline
mortgage broker
 
Join Date: Mar 2007
Location: melbourne victoria
Posts: 2,761
tobe is a splendid one to beholdtobe is a splendid one to beholdtobe is a splendid one to beholdtobe is a splendid one to beholdtobe is a splendid one to beholdtobe is a splendid one to beholdtobe is a splendid one to behold
I work for another major builder. I would google Glenvil first, they have had some high profile problems. I suggest either buying a fully completed home from a smaller builder (a spec home) that you have another builder inspect thoroughly first, or use one of the majors. All building contracts have clauses in them about guaranteeing work, however its only the larger builders that are worried enough about ACA knocking on their door and ruining business that they will actually build the house and or fix things in a timely manner after handover, rather than tell you to go jump, get a solicitor etc etc.
The majors in victoria include, metricon, henley, simonds, burbank, porter davis.
Yes,there are rocks in caroline springs, and most builders will make an exception to their fixed price contract to make you responsible for thier removal (or your wallet responsible). Its a chance you have to take unless you can find a builder who includes it in their fixed price, in which case you are usually paying a premium for the risk to be transferred to the builder...
Reply With Quote
  #17  
Old 17-12-2008, 02:38 PM
Kenster Kenster is offline
Member
 
Join Date: Jun 2005
Location: Melbourne, Victoria
Posts: 676
Kenster has a spectacular aura aboutKenster has a spectacular aura aboutKenster has a spectacular aura about
Quote:
Originally Posted by super_sam View Post
Paid Metricon $1000 in March 06 to commence work...
That someone else says there's nothing that can be done xmas should never have been promised
... Last day of March 07 and we take handover
Metricon has the building turn over time of twelve months, from first deposit date to key handover.

The first six months are spent for contract specifications, soil test, application for permits and the like.The actual building work does not start until the second six months.

Your house built from Mar 06 to Mar 07 is actually within Metricon twelve month schedule
Reply With Quote
  #18  
Old 17-12-2008, 04:22 PM
naijacoder naijacoder is offline
Member
 
Join Date: Mar 2008
Location: Melbourne,VIC
Posts: 50
naijacoder is on a distinguished road
Thanks I'll check that out.
I was in Glenvill and i liked the package they are proposing...
Any experiences with them..I need some advices
Thanks


Quote:
Originally Posted by Bon View Post
How about Serentiy Projects?
Reply With Quote
  #19  
Old 17-12-2008, 04:59 PM
super_sam super_sam is offline
Member
 
Join Date: Aug 2007
Location: Melbourne
Posts: 150
super_sam is on a distinguished road
Quote:
Originally Posted by Kenster View Post
Metricon has the building turn over time of twelve months, from first deposit date to key handover.

The first six months are spent for contract specifications, soil test, application for permits and the like.The actual building work does not start until the second six months.

Your house built from Mar 06 to Mar 07 is actually within Metricon twelve month schedule
My issue with it was that they were telling me 9 months until I had handed over too much money to walk away from. Their promises of xmas was one of the reasons we went with them

Not disputing that theres a 12 month schedule but at no time was it pointed out to us that is was a 12 month process until I couldnt walk away.

To the OP re Glenvill, arent they a bit more expensive? Check out Carlisle too they have sensational displays. A little more expensive than Metricon (I think) but more standard inclusions, so evens out if your going to add options
Reply With Quote
  #20  
Old 17-12-2008, 05:13 PM
cmpalmer cmpalmer is offline
Member
 
Join Date: Aug 2005
Location: Currumbin, QLD
Posts: 90
cmpalmer is on a distinguished road
Friends!

If you are building with a spec home builder such as Metricon homes. I highly recommend you use a building consultant / handover person.

We used a guy here that covers from the Gold Coast to Brisbane and he was worth his weight in Gold.

At each phase we reviewed everything with him and forced the builder to fix things. It was well worth it because you can prevent most problems after handover by paying attention during the build.

In QLD even the HIA contract states , "Its your responsibility to manage quality."


Chris
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +10. The time now is 11:19 PM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2014, vBulletin Solutions, Inc.
Copyright © Somersoft Financial Services Pty Ltd